Solar system for a 10 marla house: size it, plan the roof

By Sakunat2 November 2026 6 min readAI-assisted
Solar panels mounted on the flat roof of a 10 marla house in Lahore

A 10 marla house in Lahore or Islamabad with a monthly bill that swings between PKR 40,000 in winter and PKR 120,000 in peak summer is exactly the kind of home where solar starts to look sensible. But the quote you get from the first installer usually says "10 kW system, PKR X" and nothing about your roof, your wiring or your summer evening load. That is where people overspend or end up with a system that does not do what they imagined. This guide walks through sizing and roof planning, the way I would do it before calling any installer.

Start with your bills, not the panel count

Pull out twelve months of electricity bills and look at the units (kWh) consumed, not the rupee amount. A typical 10 marla family house with three or four air conditioners often lands somewhere between 700 and 1,500 units in June to August and 300 to 600 units in December and January. Your own numbers will differ with the number of ACs, whether you run a water pump for long hours, and if you have a tenant upstairs.

Divide your yearly units by 12 to get a monthly average, then divide by 30 for daily units. As a rough rule in Punjab and Sindh, each 1 kW of panels produces about 4 to 5 units a day on average across the year, less in smoggy winter weeks and more in clear spring weeks. So a house using 30 units a day on average is looking at roughly 6 to 7.5 kW of panels to cover most of its annual use. That is a starting figure, not a final answer.

Check how the system will be connected to the grid. Whether you can export units, how exports are credited and what paperwork your distribution company asks for have changed more than once in recent years. As of November 2026, confirm the current net-metering terms with your DISCO (LESCO, IESCO, K-Electric and so on) before you sign, because the payback maths depends on them.

Three system types and what each really solves

Bricklayer building a wall on a housing site
Bricklayer building a wall on a housing site

Not every house needs the same setup. Here is how I explain the choices to owners.

  • Grid-tied (on-grid) without batteries. Cheapest per kW. It saves money in daylight hours and, if net metering applies to you, credits surplus. It shuts down when the grid goes down, which surprises many owners during load-shedding or a feeder fault.
  • Hybrid with batteries. Costs noticeably more because of the inverter and battery bank, but keeps lights, fans and the fridge running when the grid is off. Worth it in areas with long outages, such as parts of Karachi, Peshawar outskirts or smaller cities.
  • Off-grid. Rare in cities, mostly for farmhouses and remote plots with no connection.

For most 10 marla homes in a society with fairly stable supply, a grid-tied system with a small hybrid-ready inverter is a sensible middle path: you buy the inverter once and add batteries later if outages worsen.

Plan the roof before you plan the kW

A 6 kW system needs roughly 12 to 15 panels, depending on panel wattage, and each panel takes around 2.5 to 3 square metres including gaps for cleaning. In practice that is about 400 to 500 square feet of usable roof. A 10 marla plot (about 2,250 sq ft covered area per floor on a typical plan) usually has this on the top slab, but only if you plan around what is already up there.

The usual roof obstacles:

  • The overhead water tank and its stand, which can shade panels for hours in winter when the sun is low.
  • The staircase headroom (mumty) and parapet walls on the south side.
  • Satellite dishes, solar water heaters and AC outdoor units, which people forget to count.

Panels should face south, tilted roughly at your latitude. In Lahore that is close to 30 degrees. Flat mounting on a concrete slab is cheaper but loses output, and in dusty Multan or Faisalabad it collects dirt faster. Ask the installer to draw the layout on your actual roof plan, with shadow lines at 10 am and 3 pm in December.

If you are still in the grey-structure stage, this is the cheapest moment to prepare. Ask your contractor to leave a conduit from the roof to the main distribution board, keep a space near the meter for the inverter, and put the water tank on the north side. These cost almost nothing now and avoid chipping through finished walls later.

Structure, wind and earthing

Pakistani installers often use galvanized steel stands bolted to the slab. Check three things:

  1. The anchor bolts go into the slab or beam, not just the plaster layer.
  2. The structure is designed for wind. Pre-monsoon storms in Punjab regularly knock over badly braced frames.
  3. There is a proper earthing pit and lightning arrester. Skipping it saves a few thousand rupees and risks the inverter during a thunderstorm.

Ask for the stand design in writing, and for the galvanizing thickness or at least the material specification. A frame that rusts at the joints in five years will cost more to redo than to do right today.

What a realistic budget looks like

Prices have moved quickly over the past few years as panel imports and exchange rates shifted, so treat any figure as a snapshot. As of late 2026, installer quotes for complete grid-tied systems in the range of PKR 130,000 to 190,000 per kW installed, for decent-tier panels and inverters, with hybrid systems and batteries pushing the total up considerably. Check three or four written quotes dated within the same week, because panel prices can change within days.

What moves the total:

  • Panel brand and warranty (product and performance warranty are separate things).
  • Inverter brand and whether service support exists in your city.
  • Battery chemistry and capacity if you add storage.
  • Cable length, structure type and any civil work on the roof.

Compare quotes line by line: panel wattage times quantity, inverter model, mounting material, cable size, protection devices and warranty terms. A suspiciously low quote often shortens one of those lines.

Payback: a worked example

Take a house that uses about 30 units a day and installs a 6 kW grid-tied system for, say, PKR 900,000. If the system offsets around 24 units a day and your average effective rate, including taxes and slab charges, is near PKR 50 per unit, the saving is roughly PKR 1,200 a day or about PKR 36,000 a month. That gives a simple payback of around two years. Your slab, your tariff and your actual output will move this number in either direction, so run it with your own bill instead of copying mine.

Do not forget the quiet costs: inverter replacement after roughly 8 to 12 years, battery replacement if you have batteries, and a cleaning routine every two to three weeks in dusty months. Dirty panels lose a noticeable share of output.

Who to call and what to ask

Ask installers for addresses of at least two completed houses in your area that you can visit. Ask for the DISCO application process in their own words, who handles it, and how long it took on their last three jobs. Ask what happens if the inverter fails in year two, and who comes to site.

If you are buying a house rather than building, remember that existing solar changes the value conversation. Ask for the commissioning papers, warranty cards and the net-metering file, and test the system on a sunny day before you close. Our rental yield calculator and mortgage calculator help you see how lower running costs change a tenant's willingness to pay or your own monthly budget.

A short plan for the next 30 days

Week one: collect twelve bills and compute daily units. Week two: measure the usable roof and mark tank, mumty and dishes. Week three: get three written quotes with the same specification and check the DISCO process. Week four: visit one installed system, decide on grid-tied or hybrid, and sign only with a payment schedule tied to delivery and commissioning, not a large advance. If you are budgeting a build, use our construction cost calculator to see where the roof work fits, and have a licensed engineer sign off on the slab loading before panels go up.

#solar#10 marla#construction#electricity bills#roof planning

Frequently asked questions

How many solar panels does a 10 marla house need?

It depends on your units, not the plot size. A house using about 30 units a day usually needs roughly 6 to 7.5 kW of panels, which is around 12 to 15 panels and 400 to 500 square feet of usable roof. Check your twelve-month bills and shading from the water tank before settling on a size.

Is a hybrid solar system worth it in Pakistan?

A hybrid system with batteries makes sense where outages are long, since it keeps lights, fans and the fridge running when the grid is off. In areas with stable supply, a grid-tied system with a hybrid-ready inverter costs less and lets you add batteries later if outages get worse.

What should I compare in solar quotes?

Compare panel wattage and quantity, inverter model and its local service support, mounting structure material, cable size, protection and earthing, and both product and performance warranties. Get written quotes dated in the same week, because panel prices can move within days, and avoid large advances before delivery.