A mason in Rawalpindi tells you the roof casting is tomorrow and the sand truck has just arrived. You look at the pile: it is brownish, sticky at the edges and sits in a damp lump. The mason says it is fine, and the truck driver wants his money. Sand and crush quality is the thing to check right now, not after the slab is poured and the steel is buried.
Sand and crush make up most of the volume of your concrete and plaster, yet they get far less attention than cement and steel. Poor material quietly weakens the structure, and you cannot see the damage once the shuttering is stripped. The good news is that a handful of simple site checks, plus some basic maths on quantities, catches most problems before payment.
Why sand and crush matter more than people think
Cement paste binds the mix, but the sand and crush carry the load. If the sand is full of silt or clay, the cement cannot grip the grains properly and the concrete comes out weaker, with a dusty surface. If the crush is flaky, dirty or mixed in the wrong sizes, the mix needs more paste to fill gaps and still ends up porous.
Sources differ across the country. Builders in Islamabad and Rawalpindi commonly talk about Margalla crush, in Punjab you hear of Sargodha crush, and river sand is sold under names such as Lawrencepur, Chenab and Ravi. Quality varies from pit to pit and even load to load, so a good name is not a guarantee. Treat every delivery as a fresh inspection.
In Karachi and other coastal areas there is an extra worry: salt. Sand sourced from creek or coastal pits can carry salts that attack reinforcement over time. Ask where each load came from and whether it has been washed. If the supplier cannot answer, that is your answer.
The five-minute sand test on site
You do not need a laboratory for a first screen. You need a clear glass jar or a plastic bottle with straight sides, some clean water and a few minutes.
- Fill the jar about one-third with sand from the middle of the pile, not the surface.
- Add clean water until the jar is nearly full, shake hard for a minute, then leave it to settle for a few hours if you can, or at least thirty minutes for a rough read.
- Look at the layers. Sand settles at the bottom; silt and clay settle as a finer layer above it.
- Compare the thickness of the fine layer with the sand layer.
If the silt layer is a visible, thick band, the sand is dirty. As a rule of thumb, a fine layer that is a tenth or more of the sand depth is a warning sign, and your engineer should decide the actual limit for your job. Do not argue with the supplier on the basis of my number. Argue on the basis of your engineer's.
Two more quick checks cost nothing. Rub a pinch of damp sand between your fingers: clean sand feels gritty and leaves your hand fairly clean, while silty sand leaves a muddy stain. And look at the colour. Very fine, powdery, yellowish sand is better for plaster than for structural concrete, and a mason who uses one pile for everything is cutting corners.
What good crush looks like
For crush, look at the shape and the dust. Pick up a handful and check three things.
- Shape: chunky, angular pieces are good. Long, flat, flaky pieces pack badly and weaken the mix.
- Dust coating: rub the stones in your palm. A heavy grey or brown coating means the crush has not been screened or washed and needs checking.
- Size mix: most roof and column work uses crush graded to about three-quarters or half inch, depending on the member and the engineer's drawing. If the pile contains large chunks next to fine powder, the grading is poor.
I once visited a site in Bahria Town Rawalpindi where the crush looked fine from the top, yet a shovel into the middle of the pile brought up a pocket of fine dust. The supplier had topped the truck with the good stuff. Always dig in and check from a few spots.
Measure the load before you pay
Sand and crush are sold by volume, usually cubic feet, and a truck's "full load" is a loose idea. Measure the body of the truck: length times width times average height of the pile, in feet. Compare the figure with what you were quoted. Ask the supplier to state the volume on the receipt.
Heaped loads settle during transport, so a pile that looked big at loading may measure shorter on your street. Also check whether the supplier's quote already includes unloading and delivery to your lane, because narrow streets in older parts of Lahore or Peshawar can add handling charges that surprise you later.
Prices per cubic foot change with fuel costs, river-bed restrictions and the season, so I will not give a number that will be stale next month. Get three written quotes on the same day for the same material, and ask what is included. That is the only reliable way to know the market price near you.
A rough quantity check for a 10 marla roof
Quantities are where homeowners lose money in both directions: ordering too little and paying a premium for an emergency load, or ordering too much and watching the leftover pile sink into the road. Here is a worked example for a typical roof slab. Treat it as a starting point and ask your engineer for the final figures.
Suppose your 10 marla plot has about 1,800 sq ft of roof to cast at 5 inches thick.
- Concrete volume: 1,800 x 5 / 12 = 750 cubic feet.
- Dry material needed is about 1.5 times that, so roughly 1,150 cubic feet.
- For a 1:2:4 mix, divide into seven parts: about 165 cubic feet of cement, 330 of sand and 660 of crush.
- At roughly 1.25 cubic feet per 50 kg bag, cement comes to about 130 bags.
Add some allowance for wastage, since losses of a few percent are normal. Your engineer may specify a different mix or thickness, particularly for beams, so use your own drawing. For other elements, try the construction cost calculator to see how the budget moves, and use the marla and kanal converter if your plot size is quoted in another unit.
Keep the paperwork and the proof
When you reject a load, take a dated photo of the pile and the truck number. When you accept one, keep the receipt that shows the volume and the source. If a mason or contractor is supplying the material under a lump-sum contract, put the sand and crush standard in the written agreement, since a vague quote often hides weak material.
A free improvement worth making: stand on site for the first delivery of every material. A supplier behaves differently when the owner is watching.
Your plan before the next delivery
Before the next truck arrives, buy a clear bottle, ask your engineer for the sand and crush grades and tolerance for your drawing, and agree with the mason that a bad load will be sent back without argument. Get three same-day quotes, measure each load, and keep your photos. If you are still planning the build, start with the construction cost calculator and compare it with plots for sale in the area you can actually afford. Good material costs the same to unload as bad material, and only one of them holds up your roof.
Frequently asked questions
How do I test sand for silt on site?
Fill a clear jar one-third with sand, add water, shake and let it settle. Silt and clay form a fine layer above the sand. A thick band means dirty sand. Ask your engineer for the allowed limit for your job, since structural work needs cleaner sand than plaster.
How can I tell if crush is poor quality?
Good crush is angular and chunky, with little dust. Flaky, long pieces, a heavy grey or brown dust coating when rubbed in the palm, or a mix of large chunks and fine powder all point to poor grading. Check from several spots in the pile, not only the top.
How much sand and crush does a 10 marla roof need?
For about 1,800 sq ft cast at 5 inches with a 1:2:4 mix, expect roughly 330 cubic feet of sand, 660 of crush and around 130 cement bags before wastage. Your engineer's drawing and mix design should decide the final quantities.
Keep reading
Cold weather concreting in Pakistan: protect a winter pour
Frost in the first two days can quietly weaken a roof slab. Learn when to delay, how to cover and cure, and when shuttering can come off.
17 Nov 2026 6 min read
Cold weather concrete Pakistan: pour, cover and strip
Nights near freezing slow cement and can ruin a fresh slab. Plan pour dates, covers and stripping times with your engineer before December.
25 Oct 2026 6 min read
How to compare contractor quotes in Pakistan with a BOQ
Lump-sum quotes hide shortfalls. Learn which BOQ lines to compare, where contractors cut corners, and what to fix in the contract.
30 Oct 2026 6 min read